FROM CONCEPT TO REALIZATION
Land plot potential capacity assessment
  • site potential capacity assessment in respect to the greatest possible exit of the areas, the feasibility of the planned functional use of the available altitude restrictions, sanitary gaps, requirements of insolation, density of building, transport, engineering and infrastructure and other factors of a town-planning context
  • impact assessment of the future object on a town-planning context and the immediate environment
  • preliminary landscape and visual analysis
  • assessment of an engineering and infrastructure component (external networks and requirements to construction of engineering infrastructure)
Site planning
  • Territory planning drawing with indication of:
    • property lines;
    • lines of roads, streets, driveways, communication lines, objects of engineering and transport infrastructures, passes to public water objects and their shores;
    • borders of zones of the planned placement of the capital construction project.
  • Explanatory note including regulations on placement of the capital construction project, characteristics of the planned territory development, including density and parameters of building development, characteristics of development of social, transport engineering infrastructure.
Architectural and Town-planning Solution
  • Preparation of the materials of the architectural and town-planning solution of a capital construction project required for providing the state service ‘Preparation and Issue of the Certificate on the Approval of the Architectural and Town-planning Solution of a Capital Construction Project’ in the city of Moscow in accordance with the requirements of the Committee on architecture and Urban development of the city of Moscow — the Moscow City Architecture Committee
Project Documentation
  • General explanatory note
  • Land plot layout scheme
  • Architectural design
  • Structural design
  • Engineering equipment, utilities, list of engineering and technical measures:
    • Electrical power supply system
    • Water supply system
    • Water discharge system
    • Heating, ventilation and air conditioning
    • Communication networks
    • Process solutions
  • Construction management plan
  • Dismantling and demolition works plan
  • Environmental protection measures
  • Fire-fighting measures
  • Disables people access provisions
  • Energy efficiency
  • Cost estimate
  • Other documentation:
    • Civil defense
    • Engineering systems monitoring system(SMES)
    • Crisis management system
    • Engineering Structures monitoring system
    • Project specific technical regulations for fire-fighting
    • Project specific technical regulations for designing unique buildings
    • Provisions on complex safety and anti-terrorism protection of the object and territory
    • Construction and demolition waste management regulation
    • Protective deratization system
    • Construction traffic management plan
    • Operation traffic management plan
    • Geo-technical verification of structural design
    • Insolation and illumination analysis
Working Documentation
  • General layout, ground leveling and grading
  • Landscaping and site finishing
  • Architectural design
  • Disables people access provisions
  • Structural design
  • Building structures verification analysis
  • Hardscape elements, incl. cross-walks, retaining walls, stairs, ramps, balusters
  • Vertical transportation
  • Electric power supply, 0,4 kV, electric lighting
  • Architectural lighting
  • External lighting
  • Lightning protection and grounding
  • Lobbies, entrances, exits and rainwater pipes electric heating system
  • Automated power consumption measurement system
  • Uninterruptible-power system (UPS)
  • Heating supply system, Individual heating plants, Central heat distribution stations
  • Heating supply system
  • Ventilation and air conditioning systems
  • Cold supply system
  • Water supply, water discharge and water treatment system
  • TV community reception system
  • Telephony system
  • Radio broadcasting system
  • Security alarm system
  • CCTV
  • Video intercom system
  • Disabled people alarm system
  • Access monitoring and control system, traffic management system
  • Master clock system
  • Operational communication system
  • Building management system
  • Structured cabling system
  • Local area network
  • Engineering equipment automation system
  • Dispatch control system
  • Internal fire-fighting main system
  • Water extinguishing system
  • Gaseous extinguishing system
  • Fire alarm system
  • Fire alert signal and evacuation managing system engineering
  • Smoke ventilation system
  • Process design
  • Protective deratization system
  • Waste management
Author's supervision
  • Carrying out Author’s supervision in compliance with procedures and requirements of the Federal construction norms with author’s supervision log keeping by design developers group or authorized representatives of the author-developer.
Facades and master plans visualization
  • Schematical and model visualization for demonstration of the key parameters of the developed projects of plannings and masterplan
  • Photorealistic visualization of facades and facades fragments with due consideration to the units design, selection of materials and lighting
Tender design development
  • design of comprehensive and efficient facade concepts
  • formalization of requirements to facades
  • definition of technical characteristics
  • identification and description of characteristic design, architectural, power, operational features of facades
  • detailed study of facades design
  • standardization of the building facades
  • facades specifications development
  • development of technical specifications on structure of facades works
  • architectural competitions support
  • coordination of buildings facades design
  • facades cost and budget control
  • assessment of manufacturing level of facades structures production and installation bidders
  • technical assistance and analysis of tender offers for facades
  • technical specialized supervision of manufacturing and installation.
Assistance and adaptation of the foreign designers concepts
  • Assistance to foreign designers at the Concept, Advanced Concept, Schematic Design, Design Development stages
  • Negotiating, meetings and correspondence in English